Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the acf domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /nas/content/live/plsmep/wp-includes/functions.php on line 6121
Fort Carson Building 1219 – PLS Mechanical

Fort Carson Building 1219

Home / Projects / Fort Carson Building 1219

Proudly serving “Commercial” clients

Building 1219 was a complete renovation of a 50,000 sqft building. Hydronic heating system included 2- 2.5Million BTU condensing boilers, 4-Hydronic pumps & 161 fan coil units Cooling System included- 1-Chiller, 2-condensers, 2- hydronic pumps & 161 Fan coil units. Domestic water heating system- The domestic system is preheated by using solar and brought up to temperature by using a side arm heat exchanger from the hydronic boiler system.